Bellevue Linear Storage Construction
Includes the installation of a linear underground sewer storage system, consisting of a nine row array of 108” diameter pipes. The project also includes the construction of a diversion structure, the installation of approximately 1,800 linear feet of gravity sewer (18”, 24”, 36”, and 42”), water line yard piping & appurtenances, remote flow measuring device, and electrical & instrumentation. Other associated work includes erosion control, site prep and restoration, bypass pumping, and post construction sewer assessment.
Addenda
(click to expand/collapse)

Name | Size | |||
Addendum 1 | 1.1 MB |