Hillshire Linear Storage Construction
Installation and construction of a Linear Wastewater Storage System which includes but is not limited to the installation of approximately 1,900 LF of 120” diameter SRPE pipe, storage excavation, site grading and drainage, yard piping, flow meters, various valves, pipe supports, precast concrete wetwell and valve vault, concrete diversion and pump station structures, electrical and instrumentation, concrete drives, asphalt access and parking, ornamental and chain-link fence, erosion control, traffic control, bypass pumping, and, site restoration.
Bid Documents
(click to expand/collapse)

Hard copy sets of plans and specifications are available for purchase, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Name | Size | |||
001 COVER | 1.9 MB | |||
002 C-2 | 110.4 KB | |||
003 C-3 | 245.0 KB | |||
004 C-4 | 265.0 KB | |||
005 C-5 | 1.2 MB | |||
006 C-6 | 1.3 MB | |||
007 C-7 | 1.3 MB | |||
008 C-8 | 1.2 MB | |||
009 C-9 | 587.8 KB | |||
010 C-10 | 588.1 KB | |||
011 C-11 | 2.2 MB | |||
012 C-12 | 1.1 MB | |||
013 C-13 | 4.0 MB | |||
014 C-14 | 6.1 MB | |||
015 L-1 | 194.2 KB | |||
016 M-1 | 472.4 KB | |||
017 M-2 | 567.4 KB | |||
018 M-3 | 512.0 KB | |||
019 M-4 | 572.7 KB | |||
020 M-5 | 512.8 KB | |||
021 M-6 | 1.9 MB | |||
022 M-7 | 497.2 KB | |||
023 M-8 | 552.5 KB | |||
024 M-9 | 617.5 KB | |||
025 M-10 | 1.2 MB | |||
026 M-11 | 591.0 KB | |||
027 S-1 | 234.4 KB | |||
028 S-2 | 185.4 KB | |||
029 S-3 | 228.4 KB | |||
030 S-4 | 209.2 KB | |||
031 E-1 | 300.4 KB | |||
032 E-2 | 393.7 KB | |||
033 E-3 | 248.4 KB | |||
034 EI101 | 403.5 KB | |||
035 EI102 | 185.6 KB | |||
036 EI103 | 165.9 KB | |||
037 EI104 | 165.5 KB | |||
038 EI106 | 163.2 KB | |||
039 EI106 | 159.7 KB | |||
040 EI107 | 156.5 KB | |||
041 EI108 | 180.2 KB | |||
042 EI109 | 171.4 KB | |||
043 EI110 | 189.8 KB | |||
044 EI111 | 184.7 KB |