Renovations at the Walter L. Bailey Jr. Criminal Center

The Project Base Bid (Phase IV-A) consists of the interior renovation of existing area within the CJC Administration Tower located at 201 Poplar Avenue, Memphis, TN., and as indicated on the drawings to include all work as required and associated in conjunction for the complete renovation of Lower Level West General Sessions Courtrooms and Offices as indicated.
Bid Documents (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
Project Manual Volume 1 4.0 MB
Project Manual Volume 2 6.9 MB