JTA Bus Terminal Renovation

The work of this contract comprises of the following: 1. Selective Demolition 2. General Building Construction 3. Interior Finishes 4. Doors, Windows, Hardware 5. Exterior Signage 6. Associated Mechanical, Plumbing, and Electrical Work
Bid Documents (click to expand/collapse)
Hard copies of plans and specifications are available for purchase at contractor’s expense, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Download section as a Zip file free of charge
Name Size
001 COVER 1.5 MB
002 LS.1 301.3 KB
003 C1.0 2.6 MB
004 A0.1 2.5 MB
005 A1.1 495.6 KB
006 A1.2 277.5 KB
007 A1.3 222.5 KB
008 A2.1 1.8 MB
009 A2.2 1.5 MB
010 A3.1 240.9 KB
011 A4.1 413.2 KB
012 M1.1 359.1 KB
013 M2.1 238.2 KB
014 P1.1 351.1 KB
015 P1.2 349.8 KB
016 P2.1 249.7 KB
017 E0.1 418.7 KB
018 E1.1 463.5 KB
019 E2.1 571.7 KB
020 E3.1 967.1 KB
021 E4.1 342.4 KB